23-Aug (Decided on project)
30-Aug Requirements document; and read chapter 7 of Machine Learning
6-Sep Design document and weekly schedule.  Have run and tested existing POP program for planning.
13-Sep Updated design document.  Write and test a post-processing step to add links to POP to eliminate the problem with ordering.
20-Sep Test on Logistics World, Blocks World, and one other domain; verify it works.
27-Sep Solve the problem of picking which nexus state to go toward.
  …and so on.  

If it related to a game...

23-Aug (Decided on project)
30-Aug Requirements document; searched Internet for painter's algorithm
6-Sep Design document and weekly schedule.  Wrote part of painter's algorithm.
13-Sep Finish and test painter's algorithm.
20-Sep Write pop-up menu in OpenGL
27-Sep Finish pop-up menu in OpenGL
29-Sep Integrate pop-up menu and painter's algorithm; test and verify.
  …and so on.

If you are working on a team, please specify what each partner is doing each week.